M&E Engineering Business

Our Group places a strong emphasis on quality control and is committed to ensuring that our projects comply with the relevant regulations and requirements set by our customers as we strongly believe that the quality of our projects is pertinent to our continued growth, reputation, and market standing.

 

We have, since inception, been able to meet the high standards set by most five-star luxury hotels because of our commitment to assure the quality of our services. In achieving such standards, our Group adopts strict protocols when it comes to the delivery of our services to our customers. In particular, our protocols ensure that our employees adhere to our customers’ house rules, safety standards, and other operational requirements, and most importantly, mitigating or minimizing disruptions to hotel operations.

 

We set out below the general quality management procedures that have been implemented in the delivery of our services.

Upon the award of a project, we would form a project management team and the team will formulate a systematic work plan in relation to the following key areas: (i) performance and quality of our services; (ii) budget planning; and (iii) management of completion schedules.

 

Our project team maintains the performance and quality of our services by ensuring that all our employees, from the project director to workers on the ground, are adequately trained in technical skills and customer service. Cost plans for all projects are carefully drafted out and closely tracked to ensure that projects are completed without the approved budget. In addition, our project team closely supervises each project to ensure that actual progress is matched to planned progress and that all significant milestones or stages of projects must take place no later than their specified dates.

To maintain the quality of all our projects, our Group ensures that our sub-contractors, suppliers, and professionals have the relevant experiences and proven track records before appointing or engaging them. We also conduct regular briefings with our sub-contractors before the commencement of projects on their expected conduct at the customers’ premises and the work ethics of our Group, in particular for our projects at five-star luxury hotels.

We also conduct regular feedback sessions with both our customers and sub-contractors so as to continuously improve our work processes and quality to ensure our competitiveness in the industry.

Our Group adopts industry best practices such as submission of brands, adoption of strong internal policies to ensure quality, and obtaining endorsements from reputable professional engineers for designs.

Our Group adopts internal best practices which have developed since inception to ensure that we (i) provide consistent services that align with the requirements of our customers and applicable regulations; and (ii) address customer satisfaction through our continual improvement processes.

 

Our internal best practices originated from the work ethics developed by Mr. Manfred Fan throughout the years based on his experiences working with MNCs where he developed principles in ensuring quality control and adopted high ethical standards. Mr. Manfred Fan has actively inculcated such standards into the project managers and supervisors of our Group.

As a testament to our commitment to our quality and excellence, our Subsidiary, ACMES-King, was awarded the bizSAFE Star Level in 2016, while DLF Engineering was awarded the bizSAFE Level 3 certificate in 2016.

Track Record

Work Scope

Purchase materials and install multi-trade modular

Year

Target completion 2021

Work Scope

Hot and cold water piping

 

Year

Target completion 2020

Work Scope

Water supply system

 

Year

2018

Work Scope

Supply and install all sanitary and plumbing works

 

Year

2017

Work Scope

Main contractor

 

Year

2016

Work Scope

Electrical, plumbing and sanitary, air-conditioning, and ventilation systems

 

Year

2015

Projects before 2014 include…

  • Jurong Point Shopping Mall
  • Forum The Shopping Mall
  • Ritz-Carlton Millenia Singapore
  • Singapore Recreational Club
  • Changi Water Reclamation Plant
  • Tower Wing of Shangri-La Hotel Singapore
  • Regent Singapore

We also have track record for…

  • NEWater (“NEWater Systems”) by PUB
  • Floating production storage and offloading (“FPSO”) systems
  • Floating storage and offloading (“FSO”) systems
  • Oil rigs (“Floating Production Systems”)

14 Arumugam Road

#02-06 LTC Building C

Singapore 409959

enquiry@oio.sg

Follow Us:

ABOUT US

 

History

Mission

Team

Privacy Policy

BLOCKCHAIN SERVICES

OIO Enterprise Services

Our Opinions

INVESTOR RELATIONS

IR Home